VOGSY Glossary
First published on October 31, 2025 , updated on November 17, 2026Welcome to the VOGSY glossary. Here you find short definitions of the key terms you meet in VOGSY.
VOGSY is a Lead-to-Cash platform. It covers the whole flow from the first contact with a client (lead) to the money in the bank (cash). The sections below follow that flow, from accounts and sales to projects, planning, finance and time tracking. Section H explains the terms of VOGSY AI.
Some values, such as opportunity stages and deliverable statuses, can be set by each company. The examples in this glossary show common values.
A. Accounts, people & organizations
Account
The central record of a company you do business with: a prospect or a customer. It stores the key information, and it is the parent of all related contacts, opportunities and projects. In VOGSY, the account is shown as an organization.
Account team
The VOGSY users who manage the relationship with an account, for example the account manager and a sales executive. Not the same as the project team.
Company / Organization
Other words for Account. Note: "Company" can also mean one of your own legal entities. See OpCo.
Consultant
A common job role for an employee or contractor who does billable project work for clients.
Contact
A person who works at an account, for example a project sponsor at your client. The contact record stores details such as email, phone number and job title.
Contractor
A person or firm outside your company who works on your projects, for example a freelancer. In VOGSY, a contractor is a resource with its own cost rate. Read more about contractor management
Customer
An account that has at least one won opportunity or project with your company. An account without one is a prospect.
Employee
A person employed by your company. In VOGSY, an employee is a resource with a job role, skills and a cost rate. An employee can also be a VOGSY user. See User type. Read more about employees
Job role
The internal function of a person, for example "Consultant" or "Developer". The job role can be linked to a sales rate. Compare: Job title.
Job title
The official title of a person, for example "Senior Cloud Architect". It is descriptive only. Compare: Job role.
OpCo (Operating company)
One of your own legal entities in VOGSY, often in a different country with its own currency. A VOGSY environment can have several OpCos. See Multi-company. Read more about the international company structure
Person
A general word for any individual in VOGSY: an employee, a contractor or a contact.
Prospect
An account that you want to do business with, but that has no won opportunity or project yet. Compare: Customer, Lead.
Resource
Any person who can be planned on projects and who can log time: an employee or a contractor. Resources are the basis of resource planning. Read more about the resource planning view
Supplier
A company you buy goods or services from. Suppliers are used for purchase invoices and project costs.
Team member
See Project team (section C).
User type
The base level of access of a person in VOGSY: No user, Lite user, Full user or Super user. Together with the role, the user type decides the permissions of a user. See Role. Read more about roles and permissions
No user: No access to VOGSY, and therefore no permissions.
Lite user: Limited access, with the menu options that fit contractors and employees. A Lite user can track time, adjust their own planning, submit expenses, and view and change their tasks. A Lite user cannot create, view, search or change projects, opportunities or organizations.
Full user: Access to nearly all VOGSY features, menu options and resources, except the back office.
Super user: Access to all VOGSY features, menu options and resources, including the back office. This user type is for everyone who needs to work in the back office.
B. Sales & CRM
Draft quote
A quote that is still being prepared and has not been sent to the client. You can save several drafts before you send the final quote. Read more about estimating and quoting
Lead
A possible new client that is not qualified yet. When the lead is qualified, it becomes an opportunity. Compare: Prospect. Read more about managing leads
Lead-to-Cash
The whole business flow that VOGSY supports: from the first contact with a possible client (lead), through the sale, the project and the invoice, to the payment (cash).
Opportunity
A possible sale that you are working on with an account. In the opportunity you forecast revenue, build the quote, and reserve the people you will need. See Opportunity booking (section D). Read more about creating an opportunity
Opportunity source
Where an opportunity came from, for example the website, a LinkedIn campaign, your own network or a tender. Customers can set their own list of sources.
Opportunity stage
The step an opportunity has reached in the sales process. Each stage has a sales probability. The stages are set per pipeline, for example: SAL (Sales Accepted Lead), Qualify, Align, Closing, Customer (Win), On Hold, Stopped and Lost. Read more about the sales stages
Opportunity type
Shows whether an opportunity is New Business (a new client) or with an Existing Customer.
Pipeline
A set of opportunity stages for one sales process. A company can have more than one pipeline, for example for licenses and for services. Read more about the sales pipeline progression chart
Quote
The document you send to a client with the scope, deliverables, planning and price. In VOGSY, you create the quote from an opportunity. See Statement of Work. Read more about estimating and quoting
Sales probability
The chance, in percent, that an opportunity will be won. It comes from the opportunity stage and is used to weigh the revenue forecast. Read more about the sales funnel chart
Statement of Work (SOW)
A quote that describes the scope, deliverables, timelines and costs of a project in detail. It is often used as the contract with the client. Read more about opportunity projects
C. Project & task management
Activity
A type of work on a project, for example "Consulting", "Design" or "Project management". Activities are used in the calculation, and people log their time on them. This gives control over costs and invoicing. Read more about setting up activities
Billable activity
An activity whose time can be invoiced to the client. Time on a billable activity counts towards WIP. Read more about how VOGSY determines billability
Calculation limit (cap on hours)
A setting that limits the hours on a deliverable or calculation line to the calculated hours. It helps to stay within budget, especially on Fixed Price work. It is a hard block: when the calculated hours are used up, no more hours can be added. It also works on tasks, when time is tracked on tasks.
Completion percentage
How much of a deliverable is finished, in percent. The project manager sets and updates it manually. On Fixed Price projects that use the Completion method, it decides the actual sales and actual margin. See Progression method. Read more about how revenue is recognized
Day pattern
The days of the week on which a resource is planned on a project, for example "Mondays, Wednesdays and Fridays only". Read more about the project planning view
Deliverable
A defined result of a project, for example a report, a configured system or a project phase. Each deliverable has its own calculation, planning, dates, status and invoice method. Deliverables are the main building blocks of a project. Read more about the work breakdown structure
Deliverable status
The stage of a deliverable, for example "Doing". The statuses can be configured freely in a master table. See Master table (section G). Before you close a project, all its deliverables should be finished. Read more about closing a project
Milestone
An important date in a project, for example the end of a phase. In VOGSY, a milestone is usually the finish date of a deliverable. A milestone can trigger a Fixed Price invoice. Read more about invoicing methods
Planning
The overview of which resources work on which projects, and when. It shows who is busy and who is available. The planning is made of allocations. Read more about the project planning view
Progress visualization
See Weather indicator.
Progression method
The way VOGSY measures the progress of a Fixed Price project. VOGSY uses it to calculate the actual sales and the actual margin in proportion to the progress. You choose one of three methods in the project settings (see the list below). Read more about how revenue is recognized
Schedule: progress is the part of the project time that has passed, from the start date to the finish date. Reports show this as "% schedule" ("% overall schedule" for the whole project).
Budget: progress is the part of the budget that has been spent. Reports show this as "% budget" ("% overall budget" for the whole project).
Completion: progress is the completion percentage of each deliverable. The project manager updates it manually.
Project
The central place for one client engagement. Here you manage the budget, planning, tasks, team and financials from start to finish. A project is made of one or more deliverables. Read more about project management
Project role
The role of a person in a project team: Project manager or Team member.
Project status
The stage of a project: New, Opportunity pending, Opportunity won, In progress or Closed. Read more about closing a project
Project team
The people who are added to a project, each with a project role. A team member can log time on the project. Compare: Account team, Allocation. Read more about creating a new project
Task
A single to-do item in a project. A task can be given to a team member, with a due date, and can be tracked. Read more about tasks
Weather indicator
An icon that shows the health of a project, deliverable or opportunity at a glance: sunny, partially sunny, cloudy, rainy or stormy. For projects, it compares the actual hours, costs and dates with the calculation and the planning. The project card shows indicators for the timeline, the budget, the margin and the completion percentage. The rules for each icon are set in the project settings (for projects) and in the opportunity settings (for opportunities). Read more about keeping your project on track · Read more about the opportunities weather changes chart
Work Breakdown Structure (WBS)
The way the work of a project is split into smaller parts. In VOGSY, the WBS is: project → deliverables → activities → tasks. Read more about the work breakdown structure
D. Resource management
Allocation
The booking of a resource on a project for a period, with a number of hours. An allocation belongs to a line in the calculation. It can be a hard booking or a soft booking. Read more about allocating budgets and resources
Availability
The hours a resource is still free in a period: capacity minus allocations. Leave is already taken out of the capacity. Read more about the resource planning view
Capacity
The total hours a resource can work in a period, based on their working hours. Holidays and leave reduce the capacity. Read more about the resource planning view
Hard booking
An allocation of a resource on a project that is not in the status Opportunity pending. It is confirmed and reserves the resource's capacity. Compare: Soft booking. Read more about the resource planning view
Holiday
A public holiday or a company-wide day off. Holidays are set up in a holiday calendar, and VOGSY does not plan resources on those days. People can still log time on a holiday, for example when they had to work. Read more about holiday calendars
International resource pool
All resources of all your OpCos, seen as one pool. A planner in one OpCo can see, reserve and plan people from another OpCo. Also called the unified or multinational resource pool. Read more about the multinational resource pool
Opportunity booking
A tentative booking of a resource or role on the opportunity itself, before the deal is won. It is not the same as a soft booking, which is an allocation on a project. It shows the effect on capacity in advance. For example: book a "Senior Developer" on an opportunity to see if the team has room in Q3. Read more about matching demand with capacity
Overplanned
A resource has more hours allocated than their capacity in a period, for example 50 hours in a 40-hour week. VOGSY shows this in the planning. Read more about the resource planning view
Placeholder
An unnamed position in the planning, used when you know the role but not the person yet, for example "Senior Developer". A placeholder is not a person and cannot log time. Read more about the resource planning view
Seniority
The level of a resource, for example Junior, Medior or Senior. Seniority can be linked to the job role and the sales rate.
Skill
A capability or qualification of a resource, for example "Java", "Project management" or "Salesforce Certified". In the resource planner you can search for available people by skill. Read more about finding the best available resources
Skill level
How good a resource is at a skill, for example on a scale of 1 to 5, or from "Beginner" to "Expert".
Soft booking
An allocation of a resource on a project with the status Opportunity pending. The deal is not won yet, so the booking is tentative. Compare: Hard booking, Opportunity booking. Read more about matching demand with capacity
Utilization
The share of a resource's available hours that is spent on project work, in percent. Billable utilization only counts billable hours. See Billability. Read more about utilization and billability
Working hours
The contracted hours of a resource per week or per day. They are the basis for capacity and overtime. Read more about the Working hours vs Submitted hours report
E. Financials & billing
Account statement
A function in the back office to post journal entries, and to record payments received from clients and paid to suppliers. Read more about account statements
Accounts payable (AP)
The money your company owes to suppliers. In VOGSY, you manage it with purchase invoices. Read more about accounts payable
Accounts receivable (AR)
The money clients owe your company for invoices that are sent but not paid yet. Read more about accounts receivable
Actual margin
The margin of a project so far, based on the actual revenue and the actual costs (approved time and expenses). Compare: Calculated margin, Margin forecast. Read more about tracking project margins
Billability
Whether time is billable or not. For a resource, the billability target is the share of their hours that should be billable. See Utilization. Read more about billability per department
Billing period
One planned invoice moment in an invoice schedule: a date and an amount. Read more about creating invoices
Calculated margin
The planned margin of a project or deliverable, based on the calculation, before the work starts. Compare: Actual margin. Read more about tracking project margins
Calculation
The budget of a project or deliverable. It contains the planned hours per activity, sales rates, cost rates, expenses and other costs. Read more about project budgets
Calculation line
One line in a calculation. An activity line holds hours, a sales rate and a cost rate for one activity. A cost line holds another cost, for example travel or a license. Read more about adding third-party costs
Cost
What work and expenses cost your company: the hours times the cost rate, plus other project costs. VOGSY uses costs to calculate the margin. Read more about project margins
Cost rate
The internal cost per hour of a resource. It is used to calculate the cost of time on a project. Compare: Sales rate. Read more about finding resources at the best rate
Credit note
A negative invoice that cancels an invoice fully or partly, for example when an amount was wrong.
Currency
VOGSY supports more than one currency. Your company has a base currency, each OpCo has a local currency, and you can invoice a client in their own currency. Read more about multi-currency projects
Discount and surcharge
A percentage that lowers (discount) or raises (surcharge) the sales amount of a project or deliverable.
Draft invoice
An invoice that VOGSY has prepared, based on WIP or the invoice schedule, but that is not approved or sent yet. Read more about draft invoices
Exchange rate
The rate used to convert an amount from one currency to another. A user can update the rate at any time. A service is available that checks the current exchange rate. Read more about managing currencies
Expenses
Costs on a project that are not time, for example travel, software or materials. People submit expenses in VOGSY for approval. Expenses can be passed on to the client. Read more about expenses
Fixed Price
An invoice method where the client pays a fixed amount for a project or deliverable, no matter how many hours it takes. Read more about invoicing methods
Intercompany invoicing
Invoicing between your own OpCos. It is used when a resource from one OpCo works on a project of another OpCo. Read more about intercompany invoicing
Invoice
The bill you send to a customer. VOGSY creates invoices based on the invoice method. Read more about creating invoices
Invoice method
The rule for invoicing a deliverable: Time & Materials, Fixed Price or Subscription. Read more about invoice methods
Invoice reminder
An email that VOGSY can send to a client when an invoice is overdue. Read more about invoice reminders
Invoice schedule
A list of planned invoice moments (dates and amounts) for a project or deliverable. VOGSY creates a draft invoice when a date is reached or a milestone is completed. Read more about invoicing methods
Invoiced revenue
Revenue that has been invoiced to the client. Compare: Recognized revenue. Read more about how revenue is recognized
Journal
An accounting record of a financial transaction. VOGSY creates journal entries, for example for revenue, invoices and costs, and sends them to your accounting system. Read more about the Financial Transactions report
Ledger account
An account in your chart of accounts, for example "Software revenue" or "Travel costs". VOGSY links its transactions to these accounts. Read more about ledger accounts
Margin
The profit of a project, resource or company, as a percentage of revenue: (revenue − cost) ÷ revenue. Read more about monitoring margins
Margin forecast
The expected final margin of a project. It combines the actual margin of the work done with the planned hours and costs of the work still to do. Read more about the Margin Forecast chart
Opening balance
The starting values of a project, such as WIP or revenue, when you move to VOGSY from another system. Read more about opening balances
Order value
The total sales amount of a project or deliverable, including discounts and surcharges. Also called sales amount or project value. Read more about the order intake chart
Payment
Money received from a client for an invoice, or paid to a supplier. Payments are recorded with account statements. Read more about account statements
Payment condition
The payment terms agreed with a client, for example "Net 30": pay within 30 days after the invoice date. It is set on the account or the project.
PO number
The purchase order number of the client. Some clients only pay invoices that show their PO number. It is set on the project or deliverable.
Price list
A set of sales rates for a group of customers, for example by region or country. You can also give one customer their own price list. Read more about price lists
Purchase invoice
A bill you receive from a supplier. You can register it in VOGSY and, if needed, pass it on to a client as a project expense. Read more about purchase invoices
Recognized revenue
Revenue that is earned, based on the progress of the work, even if it is not invoiced yet. It follows accounting rules. Compare: Invoiced revenue. Read more about how revenue is recognized
Revenue
The income from your services. VOGSY can show recognized revenue or invoiced revenue, depending on your settings. Read more about the revenue forecast
Revenue type
A category of revenue, for example "Services" or "Licenses". Read more about revenue types
Sales amount
See Order value.
Sales rate
The price per hour that the client pays for a resource or job role. It is used on Time & Materials work and in the calculation. Compare: Cost rate. Read more about price lists
Sales tax
A tax added to an invoice, such as VAT or GST. VOGSY supports different tax types and rates. Read more about sales tax
Subscription
An invoice method where the client pays a fixed amount every period, for example every month or year. VOGSY can create these invoices automatically. Read more about invoicing methods
Time & Materials (T&M)
An invoice method where the client pays for the actual hours worked, times the sales rate. Read more about invoicing methods
WIP (Work in Progress)
The value of billable work that is done and approved, but not invoiced yet. Read more about managing Work in Progress
F. Time & leave tracking
Approved timesheet
A submitted timesheet that the approver has checked and accepted. On Time & Materials work, approved billable hours become WIP and can be invoiced. Hours on projects are approved by the project manager. Hours on non-billable activities are approved by the employee's manager (line manager). See Approver (section G). Read more about tracking time with timesheets
Client approval of timesheets
A setting on an account. When it is on, the client must approve the hours before they are invoiced.
Draft timesheet
A timesheet that a resource is still filling in. It is not submitted yet. Read more about tracking time with timesheets
Leave
Approved time off for a resource, such as holiday or sick leave. Leave lowers the resource's capacity and can be taken from their leave budget. Read more about leave management
Leave budget
The paid time off that an employee can take in a period, usually a year, in hours or days. Read more about the Leave Budgets report
Leave request
A request by an employee to take leave. The line manager approves or rejects it. Read more about requesting and tracking leave
Leave taken
The approved leave that an employee has already used in a period. Read more about the Leave Budgets report
Line manager
The manager of an employee. The line manager approves leave requests and the hours on non-billable activities. Hours on projects are approved by the project manager.
Overtime
Hours worked above a resource's working hours. Overtime can be paid out or turned into time off (TOIL). Read more about overtime
Overtime category
A type of overtime, for example "Weekday overtime" or "Weekend overtime". Each category can have its own rules for payout or TOIL. Read more about overtime
Pending leave
A leave request that is submitted but not yet approved or rejected. Read more about the Leave Requests report
Planned leave
Approved leave in the future. The planning shows the resource as unavailable on those days. Read more about requesting and tracking leave
Submitted timesheet
A timesheet that a resource has completed and sent for approval. The resource can no longer change it. Read more about tracking time with timesheets
Time entry
One record of time spent by a resource: the date, the hours, the project, the activity and often a note about the work. Read more about the time entries report
Time entry specification
A list of the time entries that can be attached to an invoice, so the client can see what the hours were spent on. It is set per account.
Time for time (TOIL)
TOIL means Time Off In Lieu. Overtime hours are not paid out, but turned into leave hours that the resource can take later. Read more about overtime
Timer
A stopwatch in the timesheet. A resource starts it when they begin work on a task or activity, and the time becomes a time entry. Read more about tracking time with timesheets
Timesheet
A weekly overview of the time entries of a resource. The resource submits it for approval. Read more about tracking time with timesheets
G. System & administration
Action
Something you can do in VOGSY, for example "Approve timesheet" or "Create invoice". Your permissions decide which actions you can take. Read more about the home screen and actions
API (Application Programming Interface)
A technical connection that lets other software exchange data with VOGSY, for custom integrations. Read more about the VOGSY APIs
Approver
A user who has the permission to approve items such as timesheets, expenses, leave requests or draft invoices.
Back office
The admin part of VOGSY. Only Super users have access. Here you set up system settings, roles, ledger accounts, master tables and integrations. Read more about the back office
Board
A dashboard that groups charts and reports for one purpose or team, for example a "Finance board" or a "Project manager board". Read more about boards
Chart
A visual view of data, such as a bar chart, pie chart or line graph. Read more about charts
Conversation
A message with comments on a project, account or opportunity. You can mention colleagues to notify them. Conversations appear in the feed. Read more about conversations
Data set (BigQuery)
VOGSY data in ready-made data sets in Google BigQuery. You can use them for your own analysis and reports in business intelligence tools. Read more about external reporting tools
Department
A part of your company, for example "Engineering" or "Marketing". Resources belong to a department, for organization and reporting. Read more about departments
Document Management System (DMS)
VOGSY works with Google Drive and SharePoint. Each project and account has a folder, where VOGSY stores documents such as invoices, and where you can keep your own project documents. Read more about managing documents · Read more about connecting Microsoft 365 or Google Workspace
Email (logged)
An email that is saved with a project, account or opportunity, so the whole team can see it. Read more about the email add-on for Outlook and Gmail
Email notification
A notification that VOGSY sends to your email inbox. See Notification.
Feed
A live list of activities, conversations and comments on a project, account or opportunity. It helps the team work together. Read more about the feed
Following
You can follow a record, such as an account, opportunity or project. You then get notifications in your feed about important updates. Read more about notifications
History
The log of all events on a record, for example status changes, submitted time and new invoices.
Home screen
The first screen after you log in. It shows your actions, feed and the items that need your attention. Read more about the home screen
KPI (Key Performance Indicator)
An important business number, used to measure performance. VOGSY has built-in KPIs such as utilization, project margin, billability and financial KPIs. Read more about financial KPIs
Label
A flexible tag, for example "High priority" or "Product ABC", that you add to projects, tasks or resources. You can filter lists and reports on labels. Read more about labels
Managed integration
A ready-made connection that VOGSY maintains with other software, for example Google Workspace, Salesforce, Xero or QuickBooks. Read more about integrations
Master table
A list in the back office with basic data that is used everywhere in VOGSY, for example the activities, currencies or job roles. Read more about the core configuration
Multi-company
A VOGSY feature to manage several OpCos in one VOGSY environment, often in different countries with different currencies. Read more about the international company setup
Note
A short text saved with a project, account or opportunity, for example the outcome of a call.
Notification
A message about something that needs your attention, for example a timesheet to approve or a task for you. VOGSY sends feed notifications, email notifications and push notifications. Read more about notifications
Permission
The right to do a specific action in VOGSY, for example "View financials" or "Edit projects". Permissions are grouped into roles.
Push notification
A notification that appears on the device you are working on. See Notification.
Report
A structured overview of VOGSY data that answers a business question, for example Utilization or WIP. You can make your own reports with BigQuery. The "Using VOGSY" section of the help center lists all standard reports. Read more in Using VOGSY
Role
A set of permissions that fits a business function. Together with the user type, the role decides what a user can see and do. User roles are: Manager, Project manager, Account manager, Professional, Contractor and Support staff. Do not confuse with the project role (Project manager or Team member). Read more about roles and permissions
Starred
A mark for favourite projects, accounts, opportunities or other items, so you can find them quickly from the main navigation.
H. VOGSY AI
AI agent
A part of VOGSY AI that works on one specific task by itself, often in the background and in several steps. For example, an agent finds projects that are ready to be invoiced, or approvals that are stuck. Most agents bring their findings and proposals to you, and you decide. Some agents also take simple actions automatically. For example, the Velocity agent sends nudges and escalations by itself. Agents only do what the user's permissions allow. VOGSY has six agents (see the list below). Read more about VOGSY AI
Capacity agent: finds matching projects for resources that are available in the future.
Closing agent: finds projects that can be closed, so the month-end closing goes faster.
Invoicing agent: finds projects that are ready to be invoiced, and draft invoices that need approval.
Planning agent: helps to reschedule hours that are not planned yet. Read more about the planning agent
Sales agent: checks the availability of resources and proposes a project for an opportunity. Read more about the Sales agent
Velocity agent: speeds up approvals. It gives verdicts on items to approve, and automatically nudges and escalates approvals that are stuck. Read more about the Velocity agent
MCP server
A connection based on the Model Context Protocol (MCP). It lets AI assistants such as Claude, ChatGPT, Microsoft Copilot and Gemini Enterprise look things up and take actions in VOGSY. Read more about the VOGSY MCP server
Prompt
The question or instruction you give to VOGSY AI, for example "Write the lessons learned for this project". Read more about how VOGSY AI works
VOGSY AI
The AI assistant built into VOGSY. You ask questions or give tasks in normal language, and VOGSY AI answers with your own VOGSY data about employees, customers, projects and opportunities. It can also create and update data for you. VOGSY AI only sees what you are allowed to see, and it shows the steps it took, so you can check the answer. You always review its answers and actions before you use them. Compare: AI agent. Read more about how VOGSY AI works